|

Demolition work continues on the sanctuary in preperation for the
supporting structure construction.
|

Workers begin anchoring steal support beams to the inner walls of
the sanctuary. Massive wooden beams will hold the walls in place
while repairs are made.
|

The massive wooden beams are unloaded and ready to stabilize the
walls of the future sancuary auditorium.
|
|

Joe Delaney, Bob Gaudreau and John Wathne inspect the interior Southwest
wall of the St. Lawrence.
|

Final preparations for the removal of one on the large circular
stained glass windows.
|

A member of TENT painting a stain glass window alcove. The group
traded work for use of the parish theater space. TENT painted the
entire theater, installed curtains, doorbells and much more.
|